pvc high pressure flexible pipe factory,pvc high pressure flexible pipe
Material: PVC
Specifications: diameter: 9mm; diameter: 15mm
Use pressure: 0.03MPa
Burst pressure: 0.5MPa
Appearance: smooth and striped two
Applicable gases: liquefied gas, natural gas, gas
Suitable for low-pressure stoves, it is forbidden to connect with medium-high pressure gas. Winter hard hair, high temperature, cold, good elasticity, no smell, their own production, factory outlets
Weifang Changsheng Plastic Co., Ltd. is a professional enterprise of plastic products and plastic machinery. It covers an area of 30000 square meters. Company owns a modernized workshop with more than 20 production lines and complete testing equipment.
For many years, we committed to the improvement of production process and innovation of products, as well as the increasing various of products to meet the demand of market. Rely on the premium quality, advanced technology, standard manage and quality control system, we build long-term cooperation relationship with clients over 20 countries.
As an OEM manufacturer, we can supply products as customers' requirement. We sincerely welcome the domestic and foreign friends to visit us.
At present, we supply a variety of PVC hose including
Steel wire and fiber reinforced flexible PVC hose
PVC garden hose
PVC spray hose
High pressure air hose
PVC gas hose
PVC shower hose
Single wallclear pvc hose
PVC suction hose
welding hose
Layflat hose
FAQ:
1.How to get free samples ?
A: Please send your address, telphone number, post code and express account number to our mail box, plus the model No. you need with QTY, we will contact you to arrange it.
2.Who pay for the express cost ?
A: We can support you free samples each model 1-3 pcs with total gross weight less than 500gram, but the express cost is to be covered by the buyer.
3.How long is the delivery time?
A: 3 to 5 working days for samples, 15 to 20 days for plastic pipes and fittings. 30 to 40 days for brass fittings after receiving deposit.
4.What is your payments?
A:T/T 30% deposit and 70% balance should be made before shippment or L/C.
5.What is your packing?
A: In general, we use normal exportation package with transparent film bags and cartons. It can be as your requirement.
Specification
|
1/2- 1-1/4” 12-40mm
|
Packing
|
25-500m/roll
|
Raw Material
|
NSF Certificated material
100% CONSTAB for PEX-b
|
Standard:
|
ASTM F1281 FOR USA
|
Type
|
Laser & overlapped welding
|
Cross-link Degree
|
≥75%
|
Tmax
|
-40℃-95℃
|
Application
|
Potable water
Floor heating
Solar energy
Radiant heating
|
OEM service
|
We're factory ,OEM service is welcome
|
1. Mainly used for home gas / liquefied gas / gas and other gas delivery.
2. High-pressure car wash / washing machine supporting the use.
3. Suitable for farmland / golf course and other places of water-saving irrigation.
4. Suitable for oxygen / acetylene / propane / carbon dioxide / nitrogen / argon and other industrial gas delivery
Method of operation
1, the gas pipe installed, it is necessary to properly protect (especially in the paste ceramic tile) shall not be unauthorized demolition, moving, touch, smashing, crowding, pressure gas pipe to ensure that the gas pipe intact without damage.
2, remember not to seal the gas pipe, in particular, the total floor of the valve and the user's home gas meter, decorative doors can be made or leave ventilation holes, to allow enough space for maintenance and security.
3, do not disassemble the gas pipeline (including pipeline fixed hook nails or tube card) and water heater should be installed by the relevant gas company's professional and technical personnel to ensure safety.
4, there is a gas pipeline room can not be used as a bedroom, so as to avoid gas leaks, fire, endangering the safety of life. At the same time the gas pipeline through the kitchen or room can not be stacked flammable and explosive materials.
5, gas pipelines can not be buried in the wall and not less than 10cm from the ground. Gas pipe is not allowed to pass through the wall and should not be too long, cooker hose does not exceed 2 meters.
6, if the indoor pipeline has been gas, found that indoor gas leaks, you should first close the table before the gas valve, open the indoor doors and windows ventilation, electrical switches and other prohibitions to open all may cause sparks, fire detection is strictly prohibited to the outside to call for help .